The following image shows a close up of a few of the nodes in the above plan. Each node shows the name of the action or goal, and the time intervals that are still possible (one interval each for start time, stop time, and duration). Several ordering links have been added by SIPE-2 (the gray arrows) to form a correct plan and avoid potential conflicts.
Click here for a 5MB postscript file of the above picture.